This project involved a comprehensive survey, drawing package and a condition report prepared by our in-house design team.

The full thrust of the project required specialists due to the walls being significantly affected by long standing damp and high heat temperature levels throughout the basement.

Our drawings facilitated a sustainable design solution to ensure optimum ventilation in order eliminate rising damp and address the high humidity and the overheated internal conditions which were unsuitable for the end users

Leave a Reply

Your email address will not be published. Required fields are marked *